Forum topic: Previously unknown company reveals plans for “huge” data centre in north west of borough

Previously unknown company reveals plans for “huge” data centre in north west of borough

03 Nov 2026 00:20 #7677
  • Basil Clarke

Share Email a link

[Original article]

As controversy mounts in the UK and abroad over construction of data centres, a previously unknown company is consulting over proposals to build a large facility off the Ridgeway just south of the M25.

The proposed site for the data centre is the area ringed in red

A recently set-up company, Orbital Data Centres, is launching a public consultation on proposals for a new data centre and publicly accessible open space on land between the Ridgeway and the M25, next to Junction 24. The site crosses the boundary between Enfield and Hertsmere, with roughly half the site in each borough.

The consultation will be carried out online and at two public drop-in events on 9th and 10th November (see below for details). 

Data centres are being built across the world at a remarkable pace, in many cases in connection with the spread of artificial intelligence (AI). There is growing resistance, in particular in the US and despite Donald Trump's enthusiasm for such facilities. Opposition focuses on the demands the centres place on the supply of electric power, use of powerful gas or diesel backup generators and 24-hour noise coming from the facilities. There are concerns that the centres are slowing efforts to reduce climate-changing carbon emissions and might under particular circumstances result in power cuts for domestic consumers. They also use huge quantities of water for cooling purposes and emit heat (though in the case of the Enfield proposal, the developer says a closed-circuit system will reduce water usage).

No information is available about which company or companies will be using the data centre if its construction goes ahead.

Among those concerned about the Enfield proposals is Enfield Green Party (EGP). In a post on Instagram, EGP warns that the scheme would “permanently alter Green Belt land, place additional pressure on local infrastructure, energy and water resources, threaten biodiversity, and fail to serve the long-term interests of local communities”. The local Greens urge residents to take part in the consultation and submit objections, warning that “silence will be interpreted as consent”. 

For more reporting on the proposal and the concerns about data centres, follow the links below..

 

Public exhibitions

Monday 09 November

2pm - 8pm

Wyllyotts Theatre & Cinema, Potters Bar, EN6 2HZ

Tuesday 10 November

2pm - 8pm

West Lodge Park Hotel, Enfield, EN4 0PY

 

Have your say on the proposals

More reporting on the data centre proposal

Huge data centre being planned on Enfield’s Green Belt (Enfield Dispatch 29 October 2026)

Nearly 30,000 call for moratorium on data centres (BBC News website 18 September 2026)

Statement by Enfield Green Party opposing the proposed data centre

Data centres to be expanded across UK as concerns mount (BBC News website 15 August 2025)

Please Log in or Create an account to join the conversation.

Is it time to press pause on AI data centres?

03 Nov 2026 23:08 #7678
  • Basil Clarke

Share Email a link



Listen to the programme

Coincidence? Or just a sign that data centres are a hot topic at the moment? But the day after my report about the huge data centre planned for the Enfield Green Belt (scroll up the page to read it), this programme was broadcast on Radio 4. It's a good introduction to the arguments for and against.

Most horrifying to me is the news that the government is allowing new data centres to be fuelled by burning enormous amounts of gas, at a time when we urgently need to phase out gas as a fuel if we want people around the world to enjoy a habitable climate.

So artificial intelligence is so important that it's worth sacrificing the wellbeing of future generations (and probably many people alive now)? How about applying some real human intelligence so that we can save the human race?

Please Log in or Create an account to join the conversation.

Previously unknown company reveals plans for “huge” data centre in north west of borough

05 Nov 2026 16:12 #7683
  • PGC Webmaster

Share Email a link



Enfield Green Party are convening an online meeting tonight to discuss the green belt data centre proposals. Open to all Enfield residents.

There are multiple concerns about the potential negative effects, relating to the centre's enormous usage of electricity and possibly also of gas, the effects on wildlife,

Time: 7pm to 8.30pm Thursday 5th Novemner

calendar.app.google/Gxr9QnRoFB6jMdNB8

meet.google.com/meet/bcu-pnej-kuj

Please Log in or Create an account to join the conversation.

Previously unknown company reveals plans for “huge” data centre in north west of borough

05 Nov 2026 18:38 - 05 Nov 2026 18:40 #7684
  • David Flint

Share Email a link

We need to be focused in our critique of this data centre. Two facts should stop this proposal:(a) It is in the Green belt, where there should be no development, and the Local Plan Inspector did recommend that there should be no development in this particular part of it. (b) the carbon emissions during construction and operation are substantial and would make it impossible for Enfield to meet its target of consistently reducing emissions. 

What about water and noise?  Orbital claims that the data centre will have a closed circuit water system so use little water. They also say that the on-site generator will only be used in emergencies and in periodic tests. Those claims are plausible but residents and the Council should insist that if planning permission is granted they are adhered to and that Orbital never uses on-site generation instead of the grid since emissions from gas are higher than those from the mixture of technologies that power the grid.
Last edit: 05 Nov 2026 18:40 by PGC Webmaster.

Please Log in or Create an account to join the conversation.

Moderators: PGC Webmaster, Basil Clarke
Time to create page: 0.171 seconds
Powered by PGC Forums

Find us on Facebook

Follow us on Twitter

Follow us on Bluesky

Clicky