pgc all green working and signpost with lettering new colour 2
pgc all green working and signpost with lettering new colour 2
facebook icon twitter icon

Share this article share on facebook share on twitter

Palmers Green Action Team have announced the results of the voting to choose the design to be painted on the railway bridge on Aldermans Hill: No 2 (above) was the clear winner, but the design will now incorporate elements of design No 1 (below).

We have a winner! You voted in your hundreds, on our website and on our social channels and with 675 votes cast, the clear winner with 416 votes was Design 2! ?

We took on board a lot of your comments, that people liked the arrows from Design 1 so we have asked @manyhands.studio to incorporate them and redraft the design ✏️ Thanks to everyone who voted, we plan for the work to be carried out in the summer and thanks too to @arbeitstudios for their partnership on this project.

Links

Brushing up the bridge (Palmers Green Community 21 May 2023)

Log in to comment
Clicky